dc.contributor.advisor | Ishak, Aulia | |
dc.contributor.author | Sipahutar, Muhammad Fikri Prayoga | |
dc.date.accessioned | 2023-07-05T06:45:00Z | |
dc.date.available | 2023-07-05T06:45:00Z | |
dc.date.issued | 2023 | |
dc.identifier.uri | https://repositori.usu.ac.id/handle/123456789/85650 | |
dc.description.abstract | Every producer in the industry wants the production process to keep running to
maintain business continuity, but business management is not free from risk. Risks
can arise along the supply chain from procurement of materials to delivery of goods
to consumers. Therefore good management is very important to do. This research
was conducted at CV. his research was conducted at CV. Chandra Jaya which is
engaged in the manufacture of furniture. While undergoing production activities,
there were obstacles experienced by CV. Chandra Jaya. There are obstacles to the
poor quality of raw materials, requiring reordering, to changes in the number of
orders that cause a lack of raw materials to carry out production. The purpose of
this study is to identify risks and obtain mitigation plans to minimize risks that can
affect the furniture supply chain. The stages of the research carried out are activity
mapping, determining risk events, risk agents, calculating the Aggregate Risk
Potential and risk mitigation actions using the House Of Risk (HOR) method. The
results showed that there were 29 risk events and 24 risk agents. The results of the
ARP calculation obtained 11 risk agents with the highest priority. There are 12 risk
mitigation actions that can be recommended to CV. Chandra Jaya to address risks
in the supply chain.) | en_US |
dc.language.iso | id | en_US |
dc.publisher | Universitas Sumatera Utara | en_US |
dc.subject | Furniture Supply Chain | en_US |
dc.subject | Risk Mitigation | en_US |
dc.subject | Risk Agent | en_US |
dc.subject | Risk Event | en_US |
dc.subject | House Of Risk (HOR) | en_US |
dc.title | Analisis Mitigasi Risiko Rantai Pasok Furniture dengan Metode House Of Risk (Hor) di Cv. Chandra Jaya | en_US |
dc.type | Thesis | en_US |
dc.identifier.nim | NIM190403012 | |
dc.identifier.nidn | NIDN0020116702 | |
dc.identifier.kodeprodi | KODEPRODI26201#Tehnik Industri | |
dc.description.pages | 106 Halaman | en_US |
dc.description.type | Skripsi Sarjana | en_US |