Analisis Pengukuran Kinerja Manajemen Rantai Pasok di PT. Winson Prima Sejahtera Menggunakan Metode Supply Chain Operation Referecnce (Scor) dan Analytical Hirarchy Process (AHP)
View/ Open
Date
2023Author
Adilah, Nurul Syifa
Advisor(s)
Ishak, Aulia
Metadata
Show full item recordAbstract
PT. Winson Prima Sejahtera is a company engaged in the fisheries sector which
produces yellow fin tuna in various cut shapes such as loin, fillet, steak, cube, etc.
This research is useful to see where in the production process there are various
indicators that cause a decrease in performance. Based on these indicators, it is
necessary to carry out further improvements and improvements by KPIs determined
by the traffic light system to make it easier to determine which indicators need
improvement and improvement. The stages of the research carried out were to
determine the Key Performance Indicator based on the company's environmental
conditions, after that it was weighted using Snorm De Boer, then the hierarchy were
determined which were grouped into level 1, level 2, and level 3 using the Analytical
Hierarchy Process (AHP). ) to compare which factors are more influential than the
weighting of each work indicator, finally calculating the overall value of the final
supply chain performance obtained by multiplying the KPI normalized value
(SCOR) and the AHP weighting results. From the results of the research that has
been done there are 34 indicators overall where 12 indicators are red, namely 1).
There is a suitability of the number of employees with the number of jobs 2). The
team includes all parts of the activity 3). Receipt of raw materials 4). Procedure for
cutting fish 5). The accuracy of the training schedule 6). Implementation of
socialization 7). Training material according to sop 8). The team understands and
carries out the assigned duties, responsibilities and authorities 9). Schedule of
training implementation 10). Suitable production facilities 11). Conformity of
demand for grade (quality) of fish 12). Export shipments are made on time and 1
indicator is yellow, namely 1). The incompatibility of incoming materials is
determined using the traffic light system, which means the company needs to make
improvements to the red indicator and make improvements to the yellow indicator