• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Industrial Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Industrial Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Pengukuran Kinerja Rantai Pasok pada PT. Sisirau Menggunakan Metode Supply Chain Operation Reference Digital Standard (SCOR DS)

    Thumbnail
    View/Open
    Cover (1.621Mb)
    Fulltext (5.057Mb)
    Date
    2023
    Author
    Romadhan, Aqillah Putera
    Advisor(s)
    Syahputri, Khalida
    Metadata
    Show full item record
    Abstract
    Palm oil is a product that easily degrades, especially in the process of oil palm plantations to the processing of palm oil while mills must provide products with good quality and a short time to be able to meet customer demand. PT Sisirau is a company engaged in the plantation and manufacturing of processing Fresh Fruit Bunches (FFB) into Crude Palm Oil and palm kernel. PT Sisinau's palm oil mill and palm oil plantation are located in Aceh Tamiang, Aceh Province. The amount of FFB processed and the amount of CPO produced have not met the maximum production capacity target of PT. Sisirau caused by lack of supply of raw materials. The lack of supply of raw materials in the form of FFB experienced was caused by the low purchase price of FFB at PT. Sisirau when compared to other competitors in the same area so PT. Sisirau cannot meet the maximum capacity to be achieved and can cause delays in meeting consumer demand. Based on the problems that occur, it is important to measure and evaluate the performance of the palm oil mill supply chain. Performance measurement is a process to measure the effectiveness and efficiency of an action in a company's strategy plan. The study was conducted using SCOR Digital Standard and AHP models. Based on the results of the study, the final performance measurement at PMKS PT. Sisirau is 73.13 so it is included in the good category. After calculations using the SCOR DS and AHP methods, it was found that there were 3 yellow indicators and 11 red indicators in the traffic light system which were composed of 7 core processes, namely orchestrate, plan, order, source, transform, fullfill, and return
    URI
    https://repositori.usu.ac.id/handle/123456789/87926
    Collections
    • Undergraduate Theses [1591]

    Repositori Institusi Universitas Sumatera Utara - 2025

    Universitas Sumatera Utara

    Perpustakaan

    Resource Guide

    Katalog Perpustakaan

    Journal Elektronik Berlangganan

    Buku Elektronik Berlangganan

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara - 2025

    Universitas Sumatera Utara

    Perpustakaan

    Resource Guide

    Katalog Perpustakaan

    Journal Elektronik Berlangganan

    Buku Elektronik Berlangganan

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV