• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Industrial Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Industrial Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Analisis Mitigasi Risiko pada Rantai Pasok Pengadaan Bahan Baku Menggunakan Supply Chain Operation Reference (SCOR) dan House of Risk (HOR) di PT. PSPI

    Thumbnail
    View/Open
    Cover (714.4Kb)
    Fulltext (2.357Mb)
    Date
    2023
    Author
    Sihombing, Friska Maria Elisabeth
    Advisor(s)
    Sinulingga, Sukaria
    Alda, Tania
    Metadata
    Show full item record
    Abstract
    Supply chain management at PT.PSPI begins with the flow of raw material for aluminum wire which will become input for the production process of the fishing eye manufacturing industry. If the number of shipments from suppliers does not consider the raw material warehouse capacity and does not pay attention to production capacity, it will cause over stock and stock out. Delays in the distribution or procurement of raw materials can have a negative impact on the condition of raw material supplies to production process activities. PT. PSPI often experiences stockout and overstock conditions and delays in procuring raw materials where during the 2022 period there were 5 overstocks and 5 stockouts. These problems can be overcome by designing mitigation measures. This study aims to design effective risk mitigation measures to serve as a recommendation for companies based on selected priorities using the House of Risk so that the impact of risks occurring can be minimized. Based on the identification results, 25 risk events and 25 risk causative agents were found using the Supply Chain Operation Reference in House of Risk 1. Based on House of Risk 1 calculations, 10 priority risk agents were obtained for mitigation actions where the highest priority risk agent with an Aggregate Risk value The highest potential is 12.70%, namely the absence of a structured and integrated inventory reporting system. The results of House of Risk 1 are used as input to House of Risk 2 and produce 12 risk mitigation actions that can be proposed to companies. An effective and easy mitigation measure for companies to carry out based on the Effectiveness to Difficulty calculation is to make the raw material procurement plan more structured. This action can be carried out based on forecasting results, making a Bill of Materials then Purchase of Materials.
    URI
    https://repositori.usu.ac.id/handle/123456789/87938
    Collections
    • Undergraduate Theses [1591]

    Repositori Institusi Universitas Sumatera Utara - 2025

    Universitas Sumatera Utara

    Perpustakaan

    Resource Guide

    Katalog Perpustakaan

    Journal Elektronik Berlangganan

    Buku Elektronik Berlangganan

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara - 2025

    Universitas Sumatera Utara

    Perpustakaan

    Resource Guide

    Katalog Perpustakaan

    Journal Elektronik Berlangganan

    Buku Elektronik Berlangganan

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV