dc.contributor.advisor | Sinulingga, Sukaria | |
dc.contributor.advisor | Alda, Tania | |
dc.contributor.author | Sihombing, Friska Maria Elisabeth | |
dc.date.accessioned | 2023-10-02T07:47:23Z | |
dc.date.available | 2023-10-02T07:47:23Z | |
dc.date.issued | 2023 | |
dc.identifier.uri | https://repositori.usu.ac.id/handle/123456789/87938 | |
dc.description.abstract | Supply chain management at PT.PSPI begins with the flow of raw material
for aluminum wire which will become input for the production process of the
fishing eye manufacturing industry. If the number of shipments from suppliers
does not consider the raw material warehouse capacity and does not pay attention
to production capacity, it will cause over stock and stock out. Delays in the
distribution or procurement of raw materials can have a negative impact on the
condition of raw material supplies to production process activities. PT. PSPI
often experiences stockout and overstock conditions and delays in procuring raw
materials where during the 2022 period there were 5 overstocks and 5 stockouts.
These problems can be overcome by designing mitigation measures. This study
aims to design effective risk mitigation measures to serve as a recommendation
for companies based on selected priorities using the House of Risk so that the
impact of risks occurring can be minimized. Based on the identification results, 25
risk events and 25 risk causative agents were found using the Supply Chain
Operation Reference in House of Risk 1. Based on House of Risk 1 calculations,
10 priority risk agents were obtained for mitigation actions where the highest
priority risk agent with an Aggregate Risk value The highest potential is 12.70%,
namely the absence of a structured and integrated inventory reporting system. The
results of House of Risk 1 are used as input to House of Risk 2 and produce 12
risk mitigation actions that can be proposed to companies. An effective and easy
mitigation measure for companies to carry out based on the Effectiveness to
Difficulty calculation is to make the raw material procurement plan more
structured. This action can be carried out based on forecasting results, making a
Bill of Materials then Purchase of Materials. | en_US |
dc.language.iso | id | en_US |
dc.publisher | Universitas Sumatera Utara | en_US |
dc.subject | Supply chain | en_US |
dc.subject | Risk | en_US |
dc.subject | House of Risk | en_US |
dc.subject | Preventive Action | en_US |
dc.subject | SDGs | en_US |
dc.title | Analisis Mitigasi Risiko pada Rantai Pasok Pengadaan Bahan Baku Menggunakan Supply Chain Operation Reference (SCOR) dan House of Risk (HOR) di PT. PSPI | en_US |
dc.type | Thesis | en_US |
dc.identifier.nim | NIM190403073 | |
dc.identifier.nidn | NIDN8800140017 | |
dc.identifier.nidn | NIDN0007109008 | |
dc.identifier.kodeprodi | KODEPRODI26201#Teknik Industri | |
dc.description.pages | 124 Halaman | en_US |
dc.description.type | Skripsi Sarjana | en_US |