• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Chemical Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Chemical Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Prarancangan Pabrik Pembuatan Bio-Oil dengan Bahan Baku Tandan Kosong Kelapa Sawit melalui Proses Pirolisis Cepat dengan Kapasitas 11.000 Ton/Tahun dengan Tugas Khusus Keteknikan Detail Kolom Absorpsi

    Thumbnail
    View/Open
    Cover (723.6Kb)
    Fulltext (4.589Mb)
    Date
    2023
    Author
    Pamungkas, Andri
    Advisor(s)
    Irvan
    Metadata
    Show full item record
    Abstract
    he design of a bio-oil manufacturing plant from empty palm oil bunches with a fast pyrolysis process has a capacity of 11,000 tons/year and operates 330 days a year. The main process in the design of this plant consists of several stages, namely the raw material preparation stage, the pyrolysis stage and the condensation stage. The number of empty palm fruit bunches needed to reach the annual production capacity is 7,309.9 kg/hour. The specific task that was completed was the detailed engineering design of an absorption column for CO2 gas absorption. The designed absorption column has the following specifications: • Jumlah tray secara teoritis : 11 tray Ukuran absorber: • Diameter (D) : 9,376 m • Jari-jari (r) : 4,868 m • Nt Aktual : 14 tray • Tinggi : 29,207 m preminilary plant design bio-oil from empty palm oil bunches using a fast pyrolysis process is planned to be built in Asahan Regency, North Sumatra Province, with a total factory area of 16,658 m2. The water demand for this factory is supplied from the Asahan river as much as 2,332.058 kg/hour. The planned company organizational form is a Limited Liability Company (PT) with a line staff organizational structure, as well as 250 people. Hasil analisis ekonomi pada prarancangan pabrik ini adalah sebagai berikut: 1. Total modal investasi : Rp 204.384.659.009,95 2. Biaya produksi : Rp 50.034.533.012,32 3. Hasil penjualan : Rp 131.288.539.009,95 4. Laba bersih : Rp 56.671.972,575,25 5. Profit margin : 62 % 6. Break even point : 34 % 7. Return on investment : 28 % 8. Pay out time : 3,8 tahun 9. Return on network : 46 % 10. Internal rate of return : 29,7 % based the results of the analysis of the economic aspects, it can be concluded that a bio-oil manufacturing plant using empty palm fruit bunches as raw material through a fast pyrolysis process is feasible to establish.
    URI
    https://repositori.usu.ac.id/handle/123456789/88232
    Collections
    • Undergraduate Theses [1201]

    Repositori Institusi Universitas Sumatera Utara - 2025

    Universitas Sumatera Utara

    Perpustakaan

    Resource Guide

    Katalog Perpustakaan

    Journal Elektronik Berlangganan

    Buku Elektronik Berlangganan

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara - 2025

    Universitas Sumatera Utara

    Perpustakaan

    Resource Guide

    Katalog Perpustakaan

    Journal Elektronik Berlangganan

    Buku Elektronik Berlangganan

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV