• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Industrial Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Industrial Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Perbaikan Tata Letak Fasilitas di PT. Bridgestone Sumatera Rubber Estate dengan Software UA FLP dan Software Flap

    Thumbnail
    View/Open
    Cover (2.019Mb)
    Fulltext (9.362Mb)
    Date
    2022
    Author
    Revanza, Rheiza Rizky
    Advisor(s)
    Ukurta
    Metadata
    Show full item record
    Abstract
    Layout is the main cornerstone in the industrial world. Plant layout or facilities layout can be interpreted as a procedure for setting up factory facilities that have the aim of making the production process smoother. The arrangement will utilize the area (space) for the placement of machines or other supporting facilities, product storage (storage), both temporary and permanent, workers and so on. In general, PT. Bridgestone Sumatra Rubber Estate has a fairly high production cost, one of the causes is the cost of handling materials that are quite large due to poor material flow. At PT. Bridgestone Sumatra Rubber Estate found cross movement between the flow from the entrance to the weight bridge department and the flow from the production department to the warehouse department. This can cause disturbances in the flow of materials and material handling. Furthermore, the magnitude of the distance from the raw materials Department to the precleaning Department with a distance of 150 meters. This will cause the cost of moving materials to be large. The purpose of this study is to provide proposals regarding the rearrangement of production at PT. Bridgestone Sumatra Rubber Estate uses assistance from Facility Layout Program (FLAP) software and Unequal Area Facility Layout Problem (UA-FLP) software. The results of this study show that the total material transfer distance is smaller using FLAP software, which is 277 meters and the material handling costs issued are lower, namely Rp. 10,114,385. In the selected proposed layout, no crossmovement activities were found and the total distance each station had became smaller.
    URI
    https://repositori.usu.ac.id/handle/123456789/88247
    Collections
    • Undergraduate Theses [1591]

    Repositori Institusi Universitas Sumatera Utara - 2025

    Universitas Sumatera Utara

    Perpustakaan

    Resource Guide

    Katalog Perpustakaan

    Journal Elektronik Berlangganan

    Buku Elektronik Berlangganan

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara - 2025

    Universitas Sumatera Utara

    Perpustakaan

    Resource Guide

    Katalog Perpustakaan

    Journal Elektronik Berlangganan

    Buku Elektronik Berlangganan

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV