Pra Rancangan Pabrik Pembuatan Etil Asetat dari Asam Asetat dan Etanol dengan Proses Esterifikasi Menggunakan Katalis Heterogen Amberlyst-15 Kapasitas 155.000 Ton/Tahun dengan Tugas Khusus Rancangan Keteknikan Detail Fixed Bed Reactor
Abstract
The pre-designed plant for the manufacture of ethyl acetate from acetic acid and ethanol with an esterification process using amberlyst-15 heterogeneous catalyst is planned to produce with a capacity of 155,000 tons/year and operate for 330 days a year.
In the pre-design of the factory for the manufacture of ethyl acetate from acetic acid and ethanol by an esterification process using amberlyst-15 heterogeneous catalyst, it is planned to produce with a capacity of 155,000 tons/year using several stages, namely:
• Raw material preparation stage
• Stage of formation of ethyl acetate (asterification reaction)
• Ethyl acetate separation and purification stage
In the ethyl acetate formation stage (esterification reaction) a fixed bed reactor is used which operates at 80oC for 0,016 hours. The amount of acetic acid required to reach the annual production capacity is 17.801,944 kg/hour.
The specific task that was completed was the detailed engineering design of a fixed bed reactor for esterification reactions. The fixed bed reactor that has been designed has the following specifications:
• Reactor diameter : 60.895 in
• Total reactor height : 11.0224 m
• Reactor shell thickness : 0.342 in
• Reactor head thickness : 0.341 in
• Reactor material : Carbon steel SA-299
The planned factory location is a factory location in Tuban Regency, East Java, located between 111o 30′ – 112o 35′ East Longitude and 6o40′ – 7o18′ South Latitude with an area of 22,000 m2. The water demand for this factory is supplied from the Bengawan Solo River as much as 3,620.211 kg/hour. The required workforce is 176 people with the form of a Limited Liability Company (PT) business entity with a line and staff organizational structure, under the leadership of a General Manager. The results of the economic analysis of the pre-designed ethyl acetate plant are as follows:
• Total Investment Capital : IDR 1,081,047,206,198
• Total Production Cost : IDR 2,368,291,295,977
• Sales Proceeds : IDR 3,269,269,052,888
• Net Profit : IDR 589,689,941,898
• Profit Margin (PM) : 25.86%
• Break Even Point (BEP) : 50.18
• Return On Investment (ROI) : 21.10%
• Pay Out Time (POT) : 4.7 years
• Return On Network (RON) : 30.15%
• Internal Rate of Return (IRR) : 31.23%
Based on the results of the economic analysis, it can be concluded that the Plant for Manufacturing Ethyl Acetate from Acetic Acid and Ethanol Using the Esterification Process Using Amberlyst-15 Heterogeneous Catalyst is feasible to establish.
Collections
- Undergraduate Theses [1201]