Show simple item record

dc.contributor.advisorSugiharto
dc.contributor.authorMay, Michael George
dc.date.accessioned2023-11-13T09:10:43Z
dc.date.available2023-11-13T09:10:43Z
dc.date.issued2023
dc.identifier.urihttps://repositori.usu.ac.id/handle/123456789/88878
dc.description.abstractPT Palmanco is a company engaged in the production and sale of cooking oil. Problems with the oil packaging machine that have a high number of breakdowns cause losses to the company in the form of rejected products and maintenance costs. The aim of the research was to determine the optimal scheduled maintenance time and identify the causes of machine downtime based on selected critical components. Based on historical data, linear linear machines have the highest failure frequency within 1 year of production due to continuous operation. The reliability centered maintenance method is used to identify failure modes and determine preventive task policies according to the failure mode. Calculations are performed with the mean time to failure and mean time to repair according to each parameter using the engine damage distribution test. The results obtained are damage intervals of 283.5 hours for servo thread, 306.5 hours for blow, and 281.57 hours for straight. In the repair time interval obtained 60.37 hours for servo thread, 29.59 hours for blow, and 37.70 hours for straight. The proposed maintenance consists of 2 scheduled restoration tasks and 1 scheduled discard task. In the maintenance time interval obtained 33.64 days for servo screw, 56.53 for blow, and 44.57 days for straight. The total proposed cost is IDR 416,662,496 lower or 25% compared to the actual cost. Development in this study was carried out using RCM as a determinant of preventive maintenance strategies so as to reduce maintenance cost values and increase machine reliability.en_US
dc.language.isoiden_US
dc.publisherUniversitas Sumatera Utaraen_US
dc.subjectFMEAen_US
dc.subjectMaintenanceen_US
dc.subjectMaintenance Costen_US
dc.subjectRCMen_US
dc.subjectReliabilityen_US
dc.subjectSDGsen_US
dc.titleAnalisis Tindakan Preventive Maintenance pada Mesin Routary Linier Menggunakan Metode Reliability Centered Maintenanceen_US
dc.typeThesisen_US
dc.identifier.nimNIM190403077
dc.identifier.nidnNIDN0020035405
dc.identifier.kodeprodiKODEPRODI26201#Teknik Industri
dc.description.pages123 Halamanen_US
dc.description.typeSkripsi Sarjanaen_US


Files in this item

Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record