Prarancangan Pabrik Pembuatan Propilen Glikol dari Propilen Oksida Menggunakan Metode Hidrasi Kapasitas 66.000 Ton/Tahun dan Tugas Khusus Rancangan Keteknikan Detail Reaktor Hidrasi

Date
2023Author
Samosir, Michael Laurensius
Advisor(s)
Misran, Erni
Dalimunthe, Nisaul Fadilah
Metadata
Show full item recordAbstract
The chemical industry in Indonesia is a very vital factor which can act as
an intermediary between the upstream and downstream industries. One example of
a result from the upstream industry is the chemical product propylene glycol. The
using of propylene glycol in the industrial sector is very broad, those are in the
food, pharmaceutical and cosmetic industry sectors. Indonesia is currently
importing propylene glycol, and taking into consideration the predictions of
imports in the next few years and factories in several countries that are already
running, a propylene glycol plant can be established in Indonesia and start
operating in 2025.
The design of the plant for the manufacture of propylene glycol from
propylene oxide using the hydration method is planned to produce with a capacity
of 66,000 tons/year and operate for 330 days a year.
The design of a plant for the production of propylene glycol using propylene
oxide as raw material through a hydration process with a capacity of 66,000
tons/year uses five stages, those are:
1. Raw material storage stage.
2. Raw material mixing stage.
3. Product formation reaction stage.
4. Sulfuric acid catalyst separation stage.
5. Product purification stage.
The specific task that is completed is the detailed engineering design of the
hydration reactor to make the reaction produce propylene glycol products. The
designed reactor has the following specifications:
• Reactor Type: Continuous Strirred Tank Reactor (CSTR), tank with bottom
and an cap ellipsoidal, provided with a jacket. .
• Stirrer Type: Three Blade Propeller.
• Diameter of Reactor: 4,02 m.
• Height of Reactor: 5,71 m.
• Number of Baffles: 4 buah.
The planned factory location is in the Karawang Cikampek Industrial Area
(KIKC), Cikampek District, Karawang Regency, West Java, Indonesia with an area
of 31,565 m2. The employee needed for 200 people with the form of a factory
business entity is a Limited Liability Company (PT) with a line and staff
organizational structure.
The results of the economic evaluation of the design of a plant for the
production of propylene glycol using propylene oxide as raw material through a
hydration process with a capacity of 66,000 tons/year are as follows:
• Capital Investment (CI): Rp 4.299.547.506.401
• Total Cost (TC): Rp. 3.542.837.277.786
• Total Sales : Rp. 4.362.098.881.936
• Net Profit: Rp. 544.863.966.760
• Profit Margin (PM): 17,84 %
• Break Even Point (BEP): 30,21 %
• Return on Investment (ROI): 12,67 %
• Pay Out Time (POT): 7,89 tahun
• Return on Network (RON): 21,12 %
• Internal Rate of Return (IRR): 18,90 %
From the results of the economic evaluation it can be concluded that a plant
for producing propylene glycol using the hydration method with a capacity of
66,000 tons/year is reasonable and proper to build.