Show simple item record

dc.contributor.advisorNazaruddin
dc.contributor.authorSari, Indah Permata
dc.date.accessioned2023-11-20T06:45:27Z
dc.date.available2023-11-20T06:45:27Z
dc.date.issued2023
dc.identifier.urihttps://repositori.usu.ac.id/handle/123456789/89064
dc.description.abstractThe Manufacturing Industry currently wants to present quality products at affordable prices with efficient and effective processes, one of which is precast concrete. PT. XYZ especially those located on Jln. Medan Binjai is one of them, in order to meet the demand for concrete production, the company is increasing production, one of which is the production of PC Piles Concrete Framework. However, in producing the PC Piles Concrete framework, PT. XYZ implements a make to stock system. this creates a waste of inventory for the PC Piles Concrete frame which also has an impact on piling up the series, and creates waste of inventory at the frame assembly station as well as the reinforcement station. This concrete frame cannot be operated at the next station because it has to wait for the station to be empty. Therefore this research was conducted to identify and eliminate non-value added activities that occur. This study uses a lean approach with the Value Stream Mapping method and is analyzed using the 5W+1H method. Data collection was carried out by calculating the average time for each production activity description and then processing it using Process Activity Mapping tools to obtain non-value added activities. Process Activity Mapping in actual conditions shows non-value added activities such as 3 inspection activities and 6 delay activities. The results of the improved activities showed an increase in the percentage of value added by 16.33%, from 52.63% to 68.98% and a reduction in processing time of 77 minutes, from 695 minutes to 618 minutes.en_US
dc.language.isoiden_US
dc.publisherUniversitas Sumatera Utaraen_US
dc.subjectLean Supply Chainen_US
dc.subjectValue Stream Mappingen_US
dc.subject5W+1Hen_US
dc.subjectSDGsen_US
dc.titleAnalisis Kegiatan Non Value Added pada PT. XYZ Menggunakan Lean Supply Chain dengan Metode Value Stream Mappingen_US
dc.typeThesisen_US
dc.identifier.nimNIM190403142
dc.identifier.nidnNIDN0001086008
dc.identifier.kodeprodiKODEPRODI26201#Teknik Industri
dc.description.pages78 Halamanen_US
dc.description.typeSkripsi Sarjanaen_US


Files in this item

Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record