Show simple item record

dc.contributor.advisorNurhayati
dc.contributor.authorHutasuhut, Anggi Novriezdayanty
dc.date.accessioned2023-11-20T07:07:31Z
dc.date.available2023-11-20T07:07:31Z
dc.date.issued2023
dc.identifier.urihttps://repositori.usu.ac.id/handle/123456789/89070
dc.description.abstractPT. SUMBETRI MEGAH is a company engaged in the construction sector that produces construction products such as concrete electricity poles, judit, and others. This company requires six raw materials needed in producing concrete electric gutters, each raw material comes from a different supplier and a different delivery area. Often the delivery of raw materials experiences delays caused by the weather, causing delays in the completion of production, besides that, some raw materials are often stored for long periods of time and are not supposed to cause shrinkage. The design of the simulation model using the dynamic system method begins with the creation of a conceptual model, namelyrich picture andcausal loop diagram that the child simulated withsoftware Powersim. The designed simulation model has been verified by checking whether there are still logic errors or errors in the modelerror. The next model validation was carried out after passing verification with the MAPE test which showed results of 3.87% for used cement, 3.10% for used sand, 4.17% for used crushed stone, 3.8% for used nail wire. , 4.44% for the need for used concrete wire and 2.37% for the need for used PC Wire. All of these results meet the MAPE criteria <5% which means that the simulation model is included in the Very Precise criteria, so that it can be said that the simulation model is valid. Experimental simulations were carried out with three scenarios for the next 5 years. Companies can choose scenario I or scenario II for the amountinventory optimal.en_US
dc.language.isoiden_US
dc.publisherUniversitas Sumatera Utaraen_US
dc.subjectSimulationen_US
dc.subjectDynamic Systemsen_US
dc.subjectSoftware Powersimen_US
dc.subjectRaw Material Inventoryen_US
dc.subjectSDGsen_US
dc.titlePerancangan Model Simulasi Perencanaan Bahan Baku Tiang Listrik Beton pada PT. Sumbetri Megah dengan Model Sistem Dinamisen_US
dc.typeThesisen_US
dc.identifier.nimNIM190403175
dc.identifier.nidnNIDN0014056803
dc.identifier.kodeprodiKODEPRODI26201#Teknik Industri
dc.description.pages91 Halamanen_US
dc.description.typeSkripsi Sarjanaen_US


Files in this item

Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record