• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Chemical Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Chemical Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Pra Rancangan Pabrik Pembuatan Soyghurt dari Kacang Kedelai dengan Kapasitas 185 Ton/Tahun dan Tugas Khusus: Rancangan Keteknikan Detil Fermentor

    Thumbnail
    View/Open
    Cover (1.626Mb)
    Fulltext (4.822Mb)
    Date
    2023
    Author
    Sagala, Ronaldo
    Advisor(s)
    Irvan
    Sidabutar, Rivaldi
    Metadata
    Show full item record
    Abstract
    Soybeans is one of material food that has sufficient protein content tall that is by 35-40%. Peanut soya bean own content isoflavones which are one of the stu phytochemicals play a role as antioxidant For catch radical free . Therefore besides For replace The role of cow's milk in sufferers lactose intolerance , soybeans are also very good . Pre-planning factory making soyghurt from soybeans This own capacity processing material standard namely 185 tons/ year soybeans with product as much as 3340 tons/ year and will operate for 330 days in One year . The main process in pre-design factory This shared become three stage that is stage preparation and pretreatment material standard, stage making soy milk and fermentation soyghurt. At stage fermentation used fermenter with temperature 50℃ with the long fermentation process is 10 hours . Task specifically completed is design Fermenter technical details . Selected fermenter is batches with specification results planning as following : Specification Type Size Head Torispherical Flanged & Dished Head Mixer Flat 6 Blade turbine impeller Head thickness 0.25 in Reactor Height 4.65m Reactor Thickness 0.25 in Mixer Speed 40 rpm Reactor Diameter 3.35m Stirring Power 6 hp Factory making Soyghurt from peanut soya bean with the fermentation process planned established in Brongsong sub-district, Kendal Regency, Central Java. The land area required is 10,331 m 2 . Utility water requirements factory will supplied from river waridin as much as 760.1976 kg/hour. Form organization company planned is a Limited Liability Company (PT) with total number of employees as many as 100 people. Analysis results calculation factory economics making soyghurt from soybeans is as following : 1. Capital Investment (CI) : Rp 68,168,465,857.37 2. Total Cost (TC) : Rp 62,912,201,669.21 3. Profit Margin (PM) : 39.63% 4. Break Even Point (BEP) : 51.13% 5. BEP point capacity : 1738.49 tons 6. Return On Investment (ROI) : 28.92% 7. Pay Out Time (POT) : 3 year 6 month 8. Return On Network (RON) : 48.2% 9. Internal Rate of Return (IRR) : 26.57% Based on results from analysis calculation the economy has done can concluded that factory making soyghurt from peanut soya bean with capacity 185 tons/ year material standard This worthy of being established .
    URI
    https://repositori.usu.ac.id/handle/123456789/89084
    Collections
    • Undergraduate Theses [1201]

    Repositori Institusi Universitas Sumatera Utara - 2025

    Universitas Sumatera Utara

    Perpustakaan

    Resource Guide

    Katalog Perpustakaan

    Journal Elektronik Berlangganan

    Buku Elektronik Berlangganan

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara - 2025

    Universitas Sumatera Utara

    Perpustakaan

    Resource Guide

    Katalog Perpustakaan

    Journal Elektronik Berlangganan

    Buku Elektronik Berlangganan

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV