• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Industrial Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Industrial Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Analisis dan Mitigasi Risiko Supply Chain pada PT. Sumatera Arabika Gayo

    Thumbnail
    View/Open
    Cover (1.439Mb)
    Fulltext (7.241Mb)
    Date
    2023
    Author
    Widianti, Nurmai
    Advisor(s)
    Nasution, Harmein
    Hasugian, Ivo Andika
    Metadata
    Show full item record
    Abstract
    PT. Sumatera Arabica Gayo (SAG) is a company engaged in processing and exporting green beans to various countries. Green beans are dry coffee beans that are the end result of post-harvest processing of coffee beans with a moisture content range of around 12-13%. PT Sumatra Arabica Gayo in carrying out its business of exporting green beans is required to be able to compete with other companies in the same field.Currently, the Company is experiencing problem not achieved its sales growth target. This is due to various problems in the supply chain such as delays in raw materials which can hamper the production process, if these delays occur continuously it will be detrimental to the company, the initial stage of risk identification is carried out in the procurement of raw materials, then the results of the risk analysis are further investigated and risk mitigation is prepared. on supply chain activities at PT SAG using the House of Risk. In HOR stage I, risks and risk agents are identified and calculations of severity, occurrence and ARP values are performed. In HOR stage II, risk mitigation is prepared from selected risk agents. In the study, the results showed that there were 20 risk events and 22 risk agents. Based on the analysis and calculation results, 11 risk mitigation actions are obtained, namely evaluating supplier performance (PA4), conducting routine evaluations so that the processing process is in accordance with the SOP (PA3), making SOPs for each processing process (PA2), carrying out each process based on the correct SOP ( PA11), Monitoring the delivery of materials (PA1), Maintaining cooperation in terms of information and communication with suppliers (PA6), Improving the performance of planning and inventory control (PA5), Improving collaboration and communication between departments (PA9), Evaluating request data ( PA7), Providing generators (PA8), Implementing periodic maintenance on the machine (PA10).
    URI
    https://repositori.usu.ac.id/handle/123456789/89109
    Collections
    • Undergraduate Theses [1591]

    Repositori Institusi Universitas Sumatera Utara - 2025

    Universitas Sumatera Utara

    Perpustakaan

    Resource Guide

    Katalog Perpustakaan

    Journal Elektronik Berlangganan

    Buku Elektronik Berlangganan

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara - 2025

    Universitas Sumatera Utara

    Perpustakaan

    Resource Guide

    Katalog Perpustakaan

    Journal Elektronik Berlangganan

    Buku Elektronik Berlangganan

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV