• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Environmental Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Environmental Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Pra Rancangan Instalasi Pengolahan Air Minum di Kecamatan Secanggang Kabupaten Langkat

    Thumbnail
    View/Open
    Cover (774.8Kb)
    Fulltext (4.531Mb)
    Date
    2023
    Author
    Fajar, Mhd.Affan
    Advisor(s)
    Turmuzi, Muhammad
    Faisal, Muhammad
    Metadata
    Show full item record
    Abstract
    Water is a basic need required to meet the needs of economic and social activities, such as industry, trade, hospitals, hotels, offices, and education (schools). This research was made based on the background to meet the government program, namely 100-0-100 in 2019 from PUPR and the absence of previous research conducted related to the planning and design of drinking water treatment in Secanggang District. The problems faced are the lack of quantity and the declining quality of water production for domestic use. This study aims to determine the quantity and characteristics of Wampu River water suitable for use as a clean water source in Wampu District, Langkat Regency. The data used are primary data; Wampu River water quality and secondary data; population from BPS Langkat. In the raw water of the Wampu River, there are 5 parameters that exceed the quality standards of river raw water, namely; turbidity, BOD5, COD, fecal coliform, and total coliform. The projected population in 2040 is 40,924 people and the total water demand is 67 L / second. Obtained from the calculation results; 2 pre-sedimentation basins with a volume of 248.09 m3, a coagulation building with a volume of 4.02 m3, 2 flocculation basins with a volume of 90 m3, 2 sedimentation basins with a volume of 248.09 m3, 4 filtration basins with a volume of 20.35 m3, chlorine disinfection needs of 17 kg / day, and 2 reservoirs with a volume of 1,075.7 m3. The estimated draft cost budget required in the planning of the Drinking Water Treatment Plant is estimated at Rp. 14,319,272,361.
    URI
    https://repositori.usu.ac.id/handle/123456789/89160
    Collections
    • Undergraduate Theses [396]

    Repositori Institusi Universitas Sumatera Utara - 2025

    Universitas Sumatera Utara

    Perpustakaan

    Resource Guide

    Katalog Perpustakaan

    Journal Elektronik Berlangganan

    Buku Elektronik Berlangganan

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara - 2025

    Universitas Sumatera Utara

    Perpustakaan

    Resource Guide

    Katalog Perpustakaan

    Journal Elektronik Berlangganan

    Buku Elektronik Berlangganan

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV