Analisis Produktivitas dan Biaya Pengolahan Kayu di UD. Purnama Jaya, Mabar Hilir, Kecamatan Medan Deli, Provinsi Sumatera Utara
dc.contributor.advisor | Muhdi | |
dc.contributor.author | Panjaitan, Cynthia Dew Berry | |
dc.date.accessioned | 2023-12-12T02:05:51Z | |
dc.date.available | 2023-12-12T02:05:51Z | |
dc.date.issued | 2023 | |
dc.identifier.uri | https://repositori.usu.ac.id/handle/123456789/89601 | |
dc.description.abstract | The process of a wood working is one of the most important processes in the timber processing industry. The study intended to analyze the productivity and cost of the wood working. The study had done in the UD. Purnama Jaya, Mabar Hilir, Medan Deli district, North Sumatera using observation and data collection methods. Research shows that the productivity obtained on the furniture of the door represents 0.017 m3/hour, productivity gained on the furniture of the window frame of 0.63 m3/hour, and the productivity gained on window frame furniture was 0.53 m3/hour, with an average the average total cost per month is IDR 256,339,457 and the average income per month is IDR 300,000,000. | en_US |
dc.language.iso | id | en_US |
dc.publisher | Universitas Sumatera Utara | en_US |
dc.subject | Cost | en_US |
dc.subject | Machines | en_US |
dc.subject | Productivity | en_US |
dc.subject | Wood Working | en_US |
dc.subject | SDGs | en_US |
dc.title | Analisis Produktivitas dan Biaya Pengolahan Kayu di UD. Purnama Jaya, Mabar Hilir, Kecamatan Medan Deli, Provinsi Sumatera Utara | en_US |
dc.type | Thesis | en_US |
dc.identifier.nim | NIM191201034 | |
dc.identifier.nidn | NIDN0019067401 | |
dc.identifier.kodeprodi | KODEPRODI54151#Kehutanan | |
dc.description.pages | 81 Halaman | en_US |
dc.description.type | Skripsi Sarjana | en_US |
Files in this item
This item appears in the following Collection(s)
-
Undergraduate Theses [2162]
Skripsi Sarjana