dc.description.abstractConstruction projects are a form of activity that takes place within a limited period of time. Likewise with construction projects in the city of Medan. The implementation of a construction project anywhere and in any form will never avoid risk, be it small-scale or large-scale risks. Based on this background, it is necessary to conduct research to determine the level of risk in a project. This research aims to analyze the risk value of construction projects in the Kebun Bunga Stadium Complex Revitalization Project in Medan City, North Sumatra. This research uses the qualitative risk analysis method which has two objectives, namely risk identification and initial risk assessment. Furthermore, the steps taken are identification and classification of risks, and analysis of risk values and also use the help of statistical software, namely SPSS V.22 to conduct validity and reliability tests. Valid and reliable requirements are if the validity value of r count> r table and Cronbach's alpha value> r table. After that, the risk will be categorized based on the severity index value, and to determine the level of risk, a risk profile map is used as well as an assessment of the risk using qualitative risk analysis. Based on data processing, there are 32 (thirty-two) risk factors that qualify after validity and reliability tests. Likewise with the risk level, there are 42 (forty-two) eligible risk factors. From the results of the risk profile map, a low risk level of 25 (59.52%) was obtained and 17 risk factors (40.47%) were tolerable. There are two most dominant risk factors, namely the manager's inability to manage in the field and the inappropriate formwork removal time. The dominant risk factor is risk retention. So as to minimize the possibility of loss and reduce the severity if a risk occursen_US
dc.language.isoiden_US
dc.publisherUniversitas Sumatera Utaraen_US
dc.subjectConstruction Projecten_US
dc.subjectRisken_US
dc.subjectRisk Assessmenten_US
dc.subjectDominant Risk Factoren_US
dc.subjectSDGsen_US
dc.titleAnalisis Nilai Risiko Proyek Konstruksi menggunakan Qualitative Risk Analysis (Studi Kasus : Proyek Revitalisasi Komplek Stadion Kebun Bunga Medan, Sumatera Utara)en_US
dc.typeThesisen_US
dc.identifier.nimNIM180404032
dc.identifier.nidnNIDN0031126118
dc.identifier.kodeprodiKODEPRODI22201#Teknik Sipil
dc.description.pages110 Halamanen_US