dc.description.abstract | Studi perencanaan sistem jaringan perpipaan distribusi air minum ini bertujuan untuk
merancang suatu sistem pendistribusian air bersih melalui jaringan pipa serta
menganalisis aspek yang mempengaruhi dari sistem pendistribusian air bersih melalui
jaringan pipa. Metode pendistribusian air bersih yang digunakan di Perumahan
Karyawan PTPN IV Pabatu menggunakan metode gravitasi dan pompa dimana sumber
airnya berasal dari pipa induk yang dirancang pada penelitian sebelumnya. Sistem
perencanaan menggunakan aplikasi Epanet 2.0 kemudian di analisa dengan perhitungan
manual Hardy-cross. Dari hasil perhitungan di peroleh kapasitas total kebutuhan untuk
air bersih di perumahan Karyawan PTPN IV Pabatu adalah 0,0045625 m3/detik dan
kebutuhan air bersih pada saat jam puncak adalah 0,006843 m3/detik. Jenis pipa yang di
gunakan di perumahan Karyawan PTPN IV Pabatu adalah pipa PVC kelas S-10 dengan
koefesien kekasaran 150 dan diameter 100mm, 750mm, 50mm dan 25mm. Pemasangan
pipa distribusi di PTPN IV Pabatu memerlukan 1397,3 m untuk pipa 100mm, 1674,3 m
untuk pipa 75mm, 3350,2 m untuk pipa 50mm dan 1228,4 m untuk pipa 25mm. | en_US |
dc.description.abstract | The purpose of this study of planning the dringking water distribution piping network
system is to design a distribution system for clean water through pipelines also
analyzing the influencing aspects of the clean water distribution system through
pipelines. The method of distribution clean water which is used in the housing of PTPN
IV Pabatu employed used the gravity method and the pump where the water source
comes from the main pipe which is desaigned in the previous study. The planing system
is using the Epanet 2.0 application then was anlyzed by Hardy-cross manual
calculation. From the results of the calculation, the total capacity requiremen for clean
water in the housing of PTPN IV Pabatu housing complex is 0.0045625 and the need
for clean water at peak hours is 0.006843. The type of pipe used in the housing of PTPN
IV Pabatu is a S-10 PVC pipe with roughness coefficient of 150 and a diameter of
100mm, 75mm, 50mm and 25mm. Distribution pipe instalation at PTPN IV Pabatu
requires 1397.3m for 100mm pipe, 1674.3m for 75mm, 3350.2 for 50mm pipe and
1228.4m for 25mm pipe. | en_US |
dc.language.iso | id | en_US |
dc.publisher | Universitas Sumatera Utara | en_US |
dc.subject | Epanet | en_US |
dc.subject | Hardy-Cross | en_US |
dc.subject | Distribusi Air Minum | en_US |
dc.subject | Perencanaan | en_US |
dc.subject | Sistem Jaringan Air Minum | en_US |
dc.title | Perencanaan Sistem Jaringan Perpipaan Distribusi Air Minum di Perumahan Karyawan PTPN IV Pabatu | en_US |