dc.description.abstractAn accident is defined as an unplanned event. The words undesirable, unexpected and uncontrolled are used to describe these events. Accidents occur due to the risk of work accidents. Risk is a possibility or probability of something happening that can have an impact on a target. One of the methods used in carrying out the process of identifying hazard risks and sources of work accident risks is to use the House of Risk method which uses two stages in the process which are applied in the calculation of matrix tables, which produces the priority value of a hazard risk along with the risk sources and actions. prevention and control of sources of risk of work accidents. This research uses questionnaires distributed to competent respondents. In research on work accident risk identification using the House of Risk method in the Medan-Binjai Railway Elevator Construction Project, there are five sources of risk of work accident danger, namely experiencing visual impairment, being punctured by reinforcement, workers falling into excavation holes, workers being hit by tools. heavy, falling from a height. The causes of the five risks of work accidents are the absence of dividing lines, working at heights, movement of heavy equipment, exposed ends of reinforcement material and scattered dust and glare from sunlight. Based on the analysis carried out, there are preventive and control measures that can be taken in order to prevent and minimize the five risks of work accidents, namely installing dividing lines in the project work environment, installing project signs, checking and wearing PPE appropriately, covering every segments of iron reinforcement material, and cutting off each end of the remaining reinforcement.en_US
dc.language.isoiden_US
dc.publisherUniversitas Sumatera Utaraen_US
dc.subjectWork Accident Risk Identificationen_US
dc.subjectRisk Sourcesen_US
dc.subjectHouse of Risk Methoden_US
dc.subjectSDGsen_US
dc.titleIdentifikasi Risiko Kecelakaan Kerja pada Proses Pekerjaan Pier pada Proyek Pembangunan Jalur Layang Kereta Api Medan-Binjai Menggunakan Metode House of Risk (HOR)en_US
dc.title.alternativeIdentifying The Risk of Work Accidents in The Pier Work Process on The Medan-Binjai Railway Elevator Construction Project Using The House of Risk Method (HOR)en_US
dc.typeThesisen_US
dc.identifier.nimNIM190404101
dc.identifier.nidnNIDN0010108906
dc.identifier.kodeprodiKODEPRODI22201#Teknik Sipil
dc.description.pages96 Pagesen_US