Show simple item record

dc.contributor.advisorHasibuan, Novrida Harpah
dc.contributor.authorSibarani, Anastacia Febriyanti
dc.date.accessioned2024-09-05T04:49:24Z
dc.date.available2024-09-05T04:49:24Z
dc.date.issued2024
dc.identifier.urihttps://repositori.usu.ac.id/handle/123456789/96758
dc.description.abstractConstruction projects in their development often have risks. The risk that often occurs is work accidents. The Civil & Structure Preparation Works for Booster Compression Plant project is one of the construction jobs that also carries a high risk in terms of work accidents, where the work of fabricating and installing structure shelters is work that has a high level of risk in this project. Even though the implementation of risk management is quite effective, work accidents such as slips and near misses such as pinched hands still occur. The aim of this research is to identify potential dangers and risks, analyze the level of risk and analyze the control of dangerous risks that exist in the work of fabricating and installing shelter structures. This type of research uses semi-quantitative qualitative research methods, namely the JSA method with the HIRADC approach. Based on research that has been carried out, in structure fabrication work there are 47 hazard risk variables with 7 risks at extreme risk level, 12 risks at high risk level, 21 risks at moderate risk level and 7 work risks at low risk level. And in structure installation work there are 40 hazard risk variable with 10 risks at extreme risk level, 12 risks at high risk level, 12 risks at moderate risk level and 6 work risks at low risk level. The risk control plan to reduce risks carried out in this research is by carrying out control by means of elimination, technical engineering, administration, and personal protective equipment (PPE)en_US
dc.language.isoiden_US
dc.publisherUniversitas Sumatera Utaraen_US
dc.subjectFabricationen_US
dc.subjectJSAen_US
dc.subjectHIRADCen_US
dc.subjectInstallen_US
dc.subjectManagement System of Occupational Safety and Healthen_US
dc.subjectSDGsen_US
dc.titleIdentifikasi Bahaya dan Analisis Risiko pada Pekerjaan Fabrikasi & Install Structure Shelter Menggunakan JSA (Job Safety Analysis) dengan Pendekatan HIRADC (Hazard Identification, Risk Assesment & Determining Control)en_US
dc.title.alternativeHazard Identification and Risk Analysis in Structure Shelter Fabrication & Installation Work Using JSA (Job Safety Analysis) with the Approach of HIRADC (Hazard Identification, Risk Assessment & Determining Control)en_US
dc.typeThesisen_US
dc.identifier.nimNIM200407028
dc.identifier.nidnNIDN0010118706
dc.identifier.kodeprodiKODEPRODI25201#Teknik Lingkungan
dc.description.pages147 Pagesen_US
dc.description.typeSkripsi Sarjanaen_US


Files in this item

Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record