Pra Rancangan Pabrik Pembuatan Dimetil Eter dengan Bahan Baku Metanol Melalui Metode Indirect Process dengan Kapasitas 175.000 Ton/Tahun
Preliminary Design of Dimethyl Ether Plant From Methanol by Indirect Process with Production Capacity of 175.000 Tons/Year

Date
2024Author
Mujahadan, Abdillah
Aziz, Teuku Muhammad Nauval
Advisor(s)
Masyithah, Zuhrina
Metadata
Show full item recordAbstract
Preliminary Design of Dimethyl Ether Plant From Methanol by Indirect Process with Production Capacity of 175.000 Tons/Year, operating for 330 days a year. The main process in this pre-design of the plant consists of three stages: raw
material preparation, product formation, and purification.
The Dimethyl Ether Plant is planned to be established in the Guntung
district of Bontang Utara Regency, East Kalimantan Province, with a land area of 29,315 m2. It will require 129 employees and will be structured as a Limited Liability Company (PT).
The results of the economic analysis of this Dimethyl Ether Plant plant are as follows:
1. Total Investment Capital = Rp. 1.596.221.551.654
2. Total Production Cost = Rp. 2.447.719.303.493
3. Sales Revenue = Rp. 2.988.534.956.914
4. Net Profit = Rp. 334.259.665.988
5. Break Even Point (BEP) = 25,8201 %
6. Return on Investment (ROI) = 20,9407 %
7. Pay Back Period (PBP) = 4 years 7 month
8. Internal Rate of Return (IRR) = 22,1555 %
From the economic analysis results, it can be concluded that the Dimethyl Ether Plant with a capacity of 175,000 tons per year is feasible to be established