Show simple item record

dc.contributor.advisorIndrawan, Ivan
dc.contributor.authorKurniawan, Dimas
dc.date.accessioned2024-09-12T04:36:52Z
dc.date.available2024-09-12T04:36:52Z
dc.date.issued2024
dc.identifier.urihttps://repositori.usu.ac.id/handle/123456789/97217
dc.description.abstractWater is essential for human life, as all activities carried out by humans in various aspects of life are closely related to the need for water, especially clean water. However, field observations show that there are still many complaints from various segments of society receiving clean water services from PDAM Tirta Sari. These complaints include very low water flow rates and occasional disruptions, often caused by leak repairs in the pipes. Therefore, an evaluation of the clean water distribution network system at PDAM Tirta Sari in Binjai City is needed to assess the current condition of the system and find solutions to these problems. Hence, this study aims to determine the pressure, velocity, and head loss in the clean water distribution network in Binjai City This research is a quantitative descriptive study conducted during the even semester of the 2023-2024 academic year. The study focuses on the clean water distribution network system at PDAM Tirta Sari in Binjai City. The research process involves identifying the problem, conducting literature reviews, formulating hypotheses, collecting data through direct observation and interviews (primary data), and gathering supporting data from relevant institutions (secondary data). Data analysis is performed using modeling software such as EPANET 2.2. The data analysis results indicate that the condition of the clean water distribution network during peak hours at 07:00 is suboptimal. Additionally, the values for the pressure and headloss parameters exceed the specified criteria, while the velocity falls below the criteria set for PVC pipe type. This suggests that the condition of the clean water distribution network at PDAM Tirta Sari in Binjai City in 2023 does not meet the criteria outlined in the Regulation of the Minister of Public Works and Housing of the Republic of Indonesia No. 27/PRT/M 2016 regarding pressure, velocity, and headloss parameters. Therefore, to meet the criteria of the Minister of Public Works and Housing of the Republic of Indonesia No.27/PRT/M 2016 on the parameters of pressure, velocity and headloss, improvements can be made by reducing the head and flow of the pump to reduce the pressure at each junction, minimizing the pipe diameter and each junction, reducing pipe diameter to increase velocity, and reducing headloss at all pipeen_US
dc.language.isoiden_US
dc.publisherUniversitas Sumatera Utaraen_US
dc.subjectheadlossen_US
dc.subjectpressureen_US
dc.subjectvelocityen_US
dc.subjectSDGsen_US
dc.titleEvaluasi Sistem Jaringan Distribusi Air Bersih di PDAM Tirta Sari Kota Binjai Menggunakan Epanet 2.2en_US
dc.title.alternativeEvaluation of the Clean Water Distribution Network System in PDAM Tirta Sari Binjai City Using Epanet 2.2en_US
dc.typeThesisen_US
dc.identifier.nimNIM200404010
dc.identifier.nidnNIDN0005127607
dc.identifier.kodeprodiKODEPRODI22201#Teknik Sipil
dc.description.pages252 Pagesen_US
dc.description.typeSkripsi Sarjanaen_US


Files in this item

Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record