Show simple item record

dc.contributor.advisorSyahrizal
dc.contributor.authorRamadhana, Defira
dc.date.accessioned2024-09-19T03:39:34Z
dc.date.available2024-09-19T03:39:34Z
dc.date.issued2024
dc.identifier.urihttps://repositori.usu.ac.id/handle/123456789/97411
dc.description.abstractConstruction project development is an activity that is prone to work accidents because it contains many elements of danger. When working, of course, there is a higher risk of work accidents, because workers are in direct contact with heavy objects, sharp objects, electric voltage and other dangerous things. If a work accident occurs, the impact will vary from mild to serious. This study aims to identify the potential hazards that can be caused by the stages of the work then conduct a risk assessment and implement appropriate and effective controls using the Job Safety Analysis (JSA) method, this research uses a qualitative method aimed at obtaining information by direct survey/observation and interviews with workers. The results showed that there were physical hazards, ergonomic hazards, chemical hazards, mechanical hazards, and ergonomic hazards. Based on the risk assessment, in the extreme high risk category there are 6 job risks, in the high risk category there are 8 job risks, in the medium risk category there are 25 job risks and in the low risk category there are 124 job risks. The application of appropriate and effective risk control to minimize these risks is to use complete personal protective equipment, provide first aid facilities, and ensure workers understand the function and use of the work useden_US
dc.language.isoiden_US
dc.publisherUniversitas Sumatera Utaraen_US
dc.subjectHazarden_US
dc.subjectRisken_US
dc.subjectJob Safety Analysis (JSA)en_US
dc.subjectConstruction Projecten_US
dc.subjectSDGsen_US
dc.titleIdentifikasi Potensi Bahaya dengan Menggunakan Metode Job Safety Analysis (JSA) (Studi Kasus Proyek Pembangunan Supermarket Wiego)en_US
dc.title.alternativeIdentification of Hazard Potentials by using Job Safety Analysis (JSA) Method (Case Study of Wiego Supermarket Construction Project)en_US
dc.typeThesisen_US
dc.identifier.nimNIM180404012
dc.identifier.nidnNIDN0031126118
dc.identifier.kodeprodiKODEPRODI22201#Teknik Sipil
dc.description.pages154 Pagesen_US
dc.description.typeSkripsi Sarjanaen_US


Files in this item

Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record