Show simple item record

dc.contributor.advisorTambunan, Mangara Mangapul
dc.contributor.authorWardani, Fanesa Adea
dc.date.accessioned2024-09-20T14:56:21Z
dc.date.available2024-09-20T14:56:21Z
dc.date.issued2024
dc.identifier.urihttps://repositori.usu.ac.id/handle/123456789/97469
dc.description.abstractUD. Udin Mebel is a company engaged in woodworking. The production scheduling system in the company uses the First Come First Served method, where customer orders that come in first are processed first. However, this method is still not optimal because there are still frequent delays in meeting customer demands. With the current method being implemented, the company still faces challenges in meeting orders within the established time limits. Therefore, scheduling using another method is needed. In this study, scheduling of door and window leaves was conducted using the simulated annealing method with the criterion of minimizing makespan. With the proposed simulated annealing method, it is expected that the total processing time for all jobs (makespan) will be shorter. The research results show that scheduling with the company's current method resulted in a makespan of 8,90 hours with the job sequence A-B-C-D-E, while scheduling using the simulated annealing method resulted in a makespan of 8,20 hours with the job sequence B-AC- D-E. The performance of the simulated annealing method, as seen from the efficiency index parameter of 1.08, indicates that the simulated annealing method performs better, and with a relative error of 8,53%, it shows that the proposed simulated annealing method achieves a makespan saving of 8,53%en_US
dc.language.isoiden_US
dc.publisherUniversitas Sumatera Utaraen_US
dc.subjectProduction Schedulingen_US
dc.subjectFlow Shopen_US
dc.subjectFirst Come First Serve Methoden_US
dc.subjectSimulated Annealing Methoden_US
dc.subjectMakespanen_US
dc.subjectSDGsen_US
dc.titlePenjadwalan Produksi Menggunakan Metode Simulated Annealing untuk Meminimalisasi Makespan pada UD. Udin Mebelen_US
dc.title.alternativeProduction Scheduling Using the Simulated Annealing Method to Minimize Makespan at UD.Udin Furnitureen_US
dc.typeThesisen_US
dc.identifier.nimNIM200403002
dc.identifier.nidnNIDN0010105507
dc.identifier.kodeprodiKODEPRODI26201#Teknik Industri
dc.description.pages121 Pagesen_US
dc.description.typeSkripsi Sarjanaen_US


Files in this item

Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record