dc.contributor.advisor | Tambunan, Mangara Mangapul | |
dc.contributor.author | Simanjuntak, Josafat Christ Marsahala | |
dc.date.accessioned | 2024-09-30T08:58:07Z | |
dc.date.available | 2024-09-30T08:58:07Z | |
dc.date.issued | 2024 | |
dc.identifier.uri | https://repositori.usu.ac.id/handle/123456789/97934 | |
dc.description.abstract | Delays in completing production are a problem in a company due to the
production scheduling system. Scheduling is needed by a company to increase
productivity by reducing idle time during the production process. PT Sinar Utama
Jaya Abadi is a shoe manufacturing company in Indonesia with shoe brands
produced by the company, namely Adidas, Nike, Ecco, and Mizuno. The current
problem with the company is that there is a company delay in producing goods
using the company's current scheduling method, namely the FCFS (First Come
First Serve) method. Therefore, a new production scheduling is needed for the
company using the Palmer method in order to solve the problem of production
delays in the company. Scheduling using the Palmer method will produce a new
scheduling order based on the slope index value for each job, a larger slope index
value will be prioritized in job sequencing. The aim of this research is to calculate
the makespan for each brand using the FCFS method and Palmer method,
calculate the performance of the FCFS method and Palmer method for each
brand, and produce a new production schedule for the company. Based on the
performance between the company method and the Palmer method, using the
Palmer method in production scheduling produces better performance compared
to the company method so that using the Palmer method in production scheduling
will get better results compared to using the FCFS method. | en_US |
dc.language.iso | id | en_US |
dc.publisher | Universitas Sumatera Utara | en_US |
dc.subject | Production Scheduling | en_US |
dc.subject | Job Shop | en_US |
dc.subject | Palmer Method | en_US |
dc.subject | First Come First Serve Method | en_US |
dc.subject | Makespan | en_US |
dc.subject | SDGs | en_US |
dc.title | Penjadwalan Produksi Menggunakan Metode Palmer pada PT Sinar Utama Jaya Abadi | en_US |
dc.title.alternative | Production Scheduling using The Palmer Method at PT Sinar Utama Jaya Abadi | en_US |
dc.type | Thesis | en_US |
dc.identifier.nim | NIM200403144 | |
dc.identifier.nidn | NIDN0010105507 | |
dc.identifier.kodeprodi | KODEPRODI26201#Teknik Industri | |
dc.description.pages | 131 Pages | en_US |
dc.description.type | Skripsi Sarjana | en_US |