• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Industrial Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Industrial Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Reduksi Waste dengan Pendekatan Lean Manufacturing Menggunakan Metode Value Stream Mapping (VSM) dan Failure Mode and Effect Analysis (FMEA) pada PT Pabrik Es Siantar

    Waste Reduction with a Lean Manufacturing Approach Using The Value Stream Mapping (VSM) and Failure Mode and Effect Analysis (FMEA) Method at PT Pabrik Es Siantar

    Thumbnail
    View/Open
    Cover (1.229Mb)
    Fulltext (5.403Mb)
    Date
    2024
    Author
    Nainggolan, Dewi K
    Advisor(s)
    Siregar, Khawarita
    Metadata
    Show full item record
    Abstract
    PT Perusahaan Es Siantar is a manufacturing company which operates in the field of processing carbonated drinks which are labeled "Cap Badak". The problem faced by the company is that there is too much waste such as defects and waiting times in its production activities. The aim of this research is to identify and eliminate non-value added activities in the production process using the Lean Manufacturing approach and the Value Stream Mapping method and to provide suggestions for improvements using the Failure Mode Effect Analysis method. Based on the results of observations and measurements, there are 19 activities of which there are 3 non-value added time activities, namely 47,75 minutes, manufacturing lead time of 512,84 minutes, process cycle efficiency level of 76,38% and process velocity of 0.030 processes/hour. Then elimination was carried out on 3 non-value added activities and the results obtained were an improvement in the non-value added time value of 0, manufacturing lead time of 465,08 minutes, process cycle efficiency level of 84,23% and process velocity of 0.025 processes/hour. Based on the results of analysis using FMEA, it is known that the RPN value for each waste is waste waiting for filling bottles of 448 with the source of the cause being the machine, waste waiting for making the product expiry date of 216 with the source of the cause being the method, and waste defect of 192 with the source of the cause namely the machine. To reduce waste, the proposed improvement is to carry out a challenge test on the trimix machine before running, regular monitoring, improving troubleshooting and operational skills for each operator.
    URI
    https://repositori.usu.ac.id/handle/123456789/98471
    Collections
    • Undergraduate Theses [1591]

    Repositori Institusi Universitas Sumatera Utara - 2025

    Universitas Sumatera Utara

    Perpustakaan

    Resource Guide

    Katalog Perpustakaan

    Journal Elektronik Berlangganan

    Buku Elektronik Berlangganan

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara - 2025

    Universitas Sumatera Utara

    Perpustakaan

    Resource Guide

    Katalog Perpustakaan

    Journal Elektronik Berlangganan

    Buku Elektronik Berlangganan

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV