Show simple item record

dc.contributor.advisorUkurta
dc.contributor.authorSianturi, Jeremy Chris Evan
dc.date.accessioned2024-11-12T08:01:46Z
dc.date.available2024-11-12T08:01:46Z
dc.date.issued2024
dc.identifier.urihttps://repositori.usu.ac.id/handle/123456789/98736
dc.description.abstractProduction floor layout is the arrangement or planning of space within a factory or production facility that regulates the position of machinery, equipment, work areas, and material movement paths. Pipa Mas Putih company is a manufacturing company that produces screens for the oil and gas industry. This company has a common problem, namely the non-achievement of production targets due to the inefficient flow of materials on the production floor layout. This is caused by cross movement, backtracking, and the large distance between stations. So that the distance of material movement, the frequency of movement, and the total moment of movement are quite large. This problem can be solved by making improvements to the production floor layout using the graph method and the Computerised Relative Allocation of Facilities Technique (CRAFT) algorithm. This research aims to design a production floor layout that can minimise the distance of material movement, the total moment of movement, and increase the line efficiency rate value above 75%. After redesigning the layout, the proposed layout of the graph method was obtained as many as 2 alternatives and the CRAFT algorithm as many as 2 alternatives. Based on the results of the research, the selected proposed layout is alternative graph method 2. The results of the research with alternative graph method 2 are a decrease in the value of material displacement distance and total displacement moment from 607.4 metres to 331.04 metres for material displacement distance and 31,502.9 m / month to 16,494.4 m / month for total displacement moment, as well as an increase in line efficiency rate value from 58.92% to 92.29%.en_US
dc.language.isoiden_US
dc.publisherUniversitas Sumatera Utaraen_US
dc.subjectProduction floor layouten_US
dc.subjectgraph methoden_US
dc.subjectCRAFT algorithmen_US
dc.titleUsulan Perancangan Ulang Tata Letak Lantai Produksi Pembuatan Screen (Penyaring) Minyak & Gas dengan Menggunakan Metode Grafik dan Craft pada PT. Pipa Mas Putihen_US
dc.title.alternativeProposed Redesign of The Production Floor Layout for Making Oil & Gas Screens Using The Graph and Craft Method at Pipa Mas Putih Companyen_US
dc.typeThesisen_US
dc.identifier.nimNIM190403120
dc.identifier.nidnNIDN0008066208
dc.identifier.kodeprodiKODEPRODI26201#Teknik Industri
dc.description.pages147 Pagesen_US
dc.description.typeSkripsi Sarjanaen_US
dc.subject.sdgsSDGs 9. Industry Innovation And Infrastructureen_US


Files in this item

Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record