Show simple item record

dc.contributor.advisorHardi, Surya
dc.contributor.authorRafki, Muhammad Rahman
dc.date.accessioned2024-11-19T07:58:27Z
dc.date.available2024-11-19T07:58:27Z
dc.date.issued2024
dc.identifier.urihttps://repositori.usu.ac.id/handle/123456789/98955
dc.description.abstractThe electrical energy distribution system at the Selayang 150 kV substation has problems with increasing Lightning Arrester leakage current. The increase in Lightning Arrester leakage current was discovered after measuring and calculating the percentage of leakage current using Leakage Current Measurement and measuring and calculating temperature using thermovisi. This is caused by internal and external factors. Internal factors, such as the equipment used, are not functioning properly. So it can cause failure of the equipment while external factors include human error and can also include natural disturbances such as lightning, earthquakes, floods, wind ,and others. This final assignment discusses determining the feasibility of the Lightning Arrester leakage current at the Selayang 150 KV substation by analyzing measurements and calculating leakage currents on the Lightning Arrester based on PLN secondary data using the LCM (Leakage Current Measurement) test tool and using the thermovision test tool to obtain calculation results and Lightning Arrester leakage current measurements. The results of measurements and calculations in each conducting Bay, according to the limit determined by PLN, namely 150 μA, this indicates that the condition of the Lightning Arrester is in good condition and there are 30 connections in good condition and do not exceed the predetermined temperature limit, namely 10 oC.en_US
dc.language.isoiden_US
dc.publisherUniversitas Sumatera Utaraen_US
dc.subjectDistance between Lightning Arrester and Transformeren_US
dc.subjectFeasibility of Leakage Currenten_US
dc.subjectLightning Arrester (LA)en_US
dc.subjectThermovision Temperatureen_US
dc.subject150 kV Substationen_US
dc.titleAnalisis Kemampuan Arrester untuk Keamanan Transformator pada PT. PLN (Persero) Gardu Induk 150 kV Selayangen_US
dc.title.alternativeAnalysis of Arrester Capability for Transformer Safety at PT. PLN (Persero) Selayang 150 kV Substationen_US
dc.typeThesisen_US
dc.identifier.nimNIM200402119
dc.identifier.nidnNIDN0007065905
dc.identifier.kodeprodiKODEPRODI20201#Teknik Elektro
dc.description.pages74 Pagesen_US
dc.description.typeSkripsi Sarjanaen_US
dc.subject.sdgsSDGs 9. Industry Innovation And Infrastructureen_US


Files in this item

Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record